Categories: Doings

November project 2…

Wet outside and contrary to the forecast we’ve not had 24 hours rain free, but no matter, I can complete the fourk handle. Rusted fork sanded down, not entirely as the soil will complete the job. New shaft drilled (and treated against water) and fitted. But what to do about a rivet?

Inspiration in the form of a six-inch nail occurred, so into the vice and heat it up. The blowtorch couldn’t get it white, but no matter, Red will do, and some heavy handed Brummie screwdriver work peened over the end! Excellent, pleased with that!

Harry

Recent Posts

Mist or cloud?

It’s the 8th November and we are surrounded by cloud, or mist. Either way it…

2 weeks ago

Firing up the log burner…

A gotta-be-done job is stocking up the log store prior to winter. Although with a…

3 weeks ago

The wheel issue…

If you’ve been reading you’ll know that Beefy cuts or trims the surrounding hedges with…

3 weeks ago

My mind…

What’s one thing you own that holds deep sentimental value? A piece of matter. Interconnected…

4 weeks ago

The road-sweeper conundrum

This rabbit hole didn’t exist, it’s a non-rabbit hole. At least it was until my…

4 weeks ago

Don’t…

What’s one piece of travel advice you always follow? The advice came from a colleague…

4 weeks ago