It’s bonfire night part two tonight, so our own contribution is being readied.
the first fires of winter, and the Jenga tower is being prepared for ignition. Our wood supplier is across the border so the logs are kiln dried (by law). The bed is too clean, it needs a good layer of ash to draw properly which will take an evening or two, but we’re off to a roaring start, to warm the drawers by.
Three months into playing in the tunnel, what is it looking like? https://youtu.be/L9Da85uCQUQ?is=4wKPIP_pLAxEz5gp
The time is late afternoon, the date is early May, after some heavy rain and…
Our wild flower meadow and orchard is a riot of colour and activity from the…
and the Turkey is already fat! But rather incongruously she is in the garden! Not…
One swallow does make a late Spring. Today, 25th April, bang on target, they have…