It’s bonfire night part two tonight, so our own contribution is being readied.
the first fires of winter, and the Jenga tower is being prepared for ignition. Our wood supplier is across the border so the logs are kiln dried (by law). The bed is too clean, it needs a good layer of ash to draw properly which will take an evening or two, but we’re off to a roaring start, to warm the drawers by.
Impatiens glandulifera, Himalayan balsam, is a large annual plant native to the Himalayas. Via human…
A gulp of Cormorants. Apparently that’s the collective noun; or a swim (I like that).…
Hot weather on the way, and we don’t like it. We generally don’t stop, there’s…
Three months into playing in the tunnel, what is it looking like? https://youtu.be/L9Da85uCQUQ?is=4wKPIP_pLAxEz5gp
The time is late afternoon, the date is early May, after some heavy rain and…